Re: [cricket-users] drawing on the same graph the max also

From: Jeff Allen (jra@corp.webtv.net)
Date: Mon May 24 1999 - 16:48:32 PDT


From: Jeff Allen <jra@corp.webtv.net>

nicolas@gol.com wrote:
> I am running cricket 0.63 and even though I looked for a way to add
> the max 2hours and days in a graph, I didn't find how I could do it
> (basically, I want to have a similar graph as the one I have with
> mrtg).

Plotting the max data that we are collecting is not possible at this
time. I have a patch from someone (thanks Walter) that I play to take
a look at soon and integrate, but it's not high on my priorities.

> data? So is it better to have a complete different cricket for different
> polling intervals?

It's definately possible to use a separate Cricket setup to do fast
polling.

Cricket is designed to be able to poll different subtrees on different
rates, but this is not a function we have completely tested and gotten
working. A critical change to make this work was to reformat the
targetType dictionary, which is done. You need to be certain to reset
"rrd-poll-interval" in the root Defaults file to reflect the shorter
polling rate.

-- 
Jeff R. Allen                   |   jra@corp.webtv.net (work)
WebTV Networks, Inc.            |   jeff.allen@acm.org (personal)
Service Operations Toolsmith    |   http://www.munitions.com/~jra

------------------------------------------------------------------------ ONElist: where real people with real interests get connected. http://www.onelist.com Join a new list today!



This archive was generated by hypermail 2b29 : Mon Mar 06 2000 - 19:00:50 PST